|
PERSONAL DATA
STATE OF
ORIGIN: DELTA STATE
DATE OF
BIRTH: 01/05/1967
MARITAL STATUS:
MARRIED
SEX: MALE
RELIGION:
CHRISTIANITY
POSTAL
ADDRESS:
C/O AL-ROSI CONSULT, P.O. BOX 1623, ASABA.
PHONE No. /
E-MAIL:
+2348030916984 godwiniweka@gmail.com
PROFILE SUMMARY
Resourceful, analytical and
detail-driven individual with vast experience as Design/Project Engineer,
Project Manager, Testing and Commissioning Engineer. Proven competence in
planning, teamwork, problem analysis/decision making, organizing, leading and
communicating effectively. Possess strong capability
to manage multiple projects with competing deadlines. I am prompt in
identifying and resolving inefficient operational processes. Areas of
competence include, HVAC, Fire Protection, Water and Waste Water Systems, Storm
Water Systems and Plumbing Systems. In working on these systems, I have carried
out the following tasks:
·
Total planning, design,
installation supervision, testing and commissioning of electrical and
mechanical systems in various types of building facilities (commercial,
institutional & residential)
·
Submitting method
statements which include installation, testing, adjusting, and balancing
procedures applied specifically as per the project requirements, test
sheets to be used, the list of instruments to be used, and their calibration
certificates.
- Submitting the testing, adjusting, and balancing final
report, with a list of defect items (if found).
·
Submitting preliminary
reports which include equipment and system component’s technical data.
- Submitting and reviewing workshop drawings to ensure
that testing, adjusting, and balancing could be done according to the
standard and project specifications.
- Carrying out site visits during construction to ensure
that all installations and supplied equipment are implemented as per
the approved drawings and submittals.
OBJECTIVE
To uphold professionalism and excellence in
service to humanity.
DETAILS OF WORK EXPERIENCE
March 2013 –
Date Sermatech Nig. Ltd., Okupe
Estate, Lagos
[Civil and Electrical Engineering Design/Contracting ]
|
PROJECT MANAGER
·
Reporting
to the Managing Director
·
Responsible
for Planning, Staffing, Implementing, Controlling and Evaluating the Project:
Refurbishment of Central Bank of Nigeria, Owerri Branch Office, Owerri, Imo
State, valued at N5.4b. Duties include
Ø Defining project scope and creating a detailed
work plan identifying the sequences of work activities and generating project
timelines.
Ø Determining the required resources and developing
a schedule for resource allocation.
Ø
Executing the project
according to the project plan
Ø
Developing forms and
records to document project activities
Ø
Setting up files to
ensure that all project information is appropriately documented and secured
Ø
Monitoring the progress
of the project and making adjustments as necessary to ensure the successful
completion of the project timelines
Ø
Establishing a
communication schedule to update stakeholders including appropriate staff in
the organization on the progress of the project
Ø
Reviewing the quality of
the work completed with the project team on a regular basis to ensure that it
meets the project standards
Ø
Writing reports on the
project for management and other stakeholders
Ø
Monitoring and approving
all budgeted project expenditures
Ø
Monitoring cash flow
projections and reporting actual cash flow and variance to senior management
on a quarterly basis.
Ø
Ensuring that all
financial records for the project are up to date
Ø
Ensuring that the project
deliverables are on time, within budget and at the required level of quality
Ø Evaluating the outcomes of the project as established during the
planning phase
|
Jan., 2013 – Jun. 2013
Tata Messiri Consultants, Asaba,
Delta State
[Mechanical and Electrical Engineering
Services Consultants]
|
ENGINEERING MANAGER / HEAD,
CONSULTANCY DIVISION
·
Reporting to the Principal Partner
·
Responsible for developing and
coordinating training schedules/programmes for engineering personnel.
·
Responsible for 6 Project Engineering
Teams covering projects in Delta, Imo and Bayelsa States.
·
Checking plans, drawings and
quantities for accuracy of calculations, design standardization and detailing.
·
Managing, monitoring and interpreting
the contract documents supplied by the client/architect.
·
Preparation of business development
documents such as Expressions of Interest, Requests for Tender etc.
·
Planning the work, preparing Project
Work Programmes, Statement of Work Methods Shop Drawings etc.
·
Ensuring that all materials used and
work performed as per specifications
·
Preparing reports as required,
reviewing progress reports and resolving technical issues arising from
various project sites.
·
Design of FM-200 system and
production of Mechanical Services Shop drawings for a Bank in Imo State.
|
Jan. 2005 – Dec.,
2012 Al-Rosi
Consult, Asaba, Delta State
[Architects, Engineering Services Consultants]
|
HEAD, MECHANICAL ENGINEERING
·
Reporting to the Principal Partner
·
Experienced in design and managing
projects of one to thirty-six months in duration, with a development budget
of N20m to N2b, and a team of two to 35 direct and indirect resources (SMEs,
Stakeholders, Project Sponsor, QA).
·
Worked on multiple projects
simultaneously.
·
Sub-project manager responsible for
Project planning, Resource management, Budget management, RFP, RFQ processes.
·
Responsible for design of mechanical
services for projects ranging from individual buildings to the master
planning and design of entire communities. These include residential
development, public and private institutions, health care facilities,
recreational and sport facilities and hotels. Recently concluded projects
include the Asaba Business District Master plan and the new Osubi Airport
Development (Runway and support facilities).
·
Projects handled also include the
Oghara Polytechnic Master plan, 25,000 Seat Stadium at Warri, Asaba and
Sapele, 18-Hole IGCC Golf Course.
·
Mechanical services designed cover
HVAC, Plumbing, Fire Protection, Water Supply and Distribution Systems,
Wastewater and Storm water drainage systems.
·
Sound knowledge of design codes,
standards and specifications.
|
1998
–2004
Strategic
Technologies Ltd., Lagos.
[Engineering and Contracting
Services]
|
PROJECT MANAGER
·
Worked closely with the development
team as Technical Subject Matter Expert during Technical Design and Development
phases of projects.
·
Performed project planning and
preparation of project schedules, cost and quality baselines.
·
Maintaining a complete filing system
for each project handled, to include all contracts and subcontracts,
daily journals, monthly progress reports, certified payrolls, field orders,
change orders, material submittals and material testing reports, materials
inventory, quantity books, photographs, drawings and all other project
documentation and correspondence.
·
Performed HRM functions and
implemented training course for new recruits — speeding profitability.
·
Projects handled include VoIP Network
implementation for Guinness Plc Ogba Factory, Telnet HQ Lagos, and State
Security Service HQ Abuja; External electrification for Eden Garden Estate,
Lagos.
|
1994 -
1997 Churchgate Nig. Ltd., Lagos
[Industrial conglomerate spanning Textile, Shipping, Insurance and
Allied Services]
|
PROJECT ENGINEER
·
Performed design, consultancy and construction
administration.
·
Prepared Project Journals.
·
Areas of responsibility included
mechanical services design and supervision for HVAC, Plumbing, Fire
Protection, Water Supply and Distribution Systems, Wastewater and Stormwater
drainage systems.
|
1990 -
1994 Michelin Nig. Ltd.,
Port-Harcourt.
[A Tyre Manufacturing Factory]
|
UTILITIES / SHIFT ENGINEER
·
Supervised fluids production (steam,
air, vacuum, hydraulic , electricity, chilled water, hot and cold
water) for use in the factory.
·
Performed planning and scheduling of
routine maintenance tasks on steam boilers, pumps, compressors, generators
and other plants.
·
Generating daily shift report for
submission to the Engineering Manager.
|
Education Certification & Associations
|
· M.
Eng
Federal
University of Tech.,
Owerri
IN VIEW
· B.
Sc
(Hons)
Tafawa Balewa University, Bauchi. 1990
· W.A.S.C
St. Gregory’s College,
Lagos.
1978
· Member
Project Management Institute
(PMI) 2009
· Certification
Project Management Professional
(PMP) In View
· Member
Nig. Society of Engineers
(NSE)
2004
· Member
Council for Reg. of Engr. In Nigeria (COREN)
2009
|
Publications
|
· Health,
Safety and Environment Guideline
· Quality
Assurance Policy Manual
· Petty
Cash Accounting Software (Using Ms Excel)
· Engineering
Articles published in my blog www.servicesconsultant.blogspot.com
|
PROJECTS DESIGNED AND SUPERVISED
|
·
Renovation of Central Bank of
Nigeria, Owerri Branch Office, Owerri
·
Design of Mechanical and Electrical
Services for Cornerstone Schools, Asaba.
·
Design of Mechanical and Electrical
Services for 2,000 Capacity Church Auditorium for John-Mary Vianny Catholic
Church, Asaba.
·
Design of Mechanical Services for
Delta State Board of Internal Revenue Headquarters. Warri
·
Design of Mechanical and Electrical Services
for 1,200 Capacity Church Auditorium and Administrative Buildings for Jesus
Compassion Ministries, Asaba
·
Design of Mechanical Services for
Warri Township Stadium, Warri
·
Design of Mechanical Services for
Sapele Township Stadium, Sapele
·
Design of Mechanical Services for
Asaba Township Stadium, Asaba.
·
Design of Mechanical Services for New
Town Master Plan for Edo State Government
·
Design of Mechanical Services for 7
Floor Secretariat Building for Ministries of Finance and Economic Planning,
Asaba.
·
Design of Mechanical Services for
Delta State Fire Service Headquarters, Asaba.
·
· Design
of Mechanical Services for Delta State Model Fire Service Station for
the LGAs.
·
Design of Mechanical Services for
Delta State Fire Training Academy, Koko.
·
Design of Mechanical Services for
New Site Development of School of Engineering, DELSU, Oleh (Lecture
Blocks, Library, Admin Building, Workshop etc.)
·
Design of Mechanical Services for
Model Swimming Pool Design for the LGAs in Delta State.
·
Design of Mechanical Services for
Mini-Stadia Design for the LGAs in Delta State.
·
Design of Mechanical Services for
Office Complex for NDDC, Warri
·
Design of Mechanical Services for
24 Classroom Model Secondary School Buildings for Delta State.
·
Design of Mechanical and Electrical
Services for 95 Room Hotel Facility Design
·
Design of Mechanical Electrical
Services for Mother & Child Hospital Design for Rivers State
Government
·
Design of Mechanical and Electrical
Services for General Hospital Sagbama, Kiama and 2 other locations in Bayelsa
State.
·
Design of Mechanical and Electrical
Services for Detal State Ministry of Housing HQ, Asaba.
·
Design of Mechanical and Electrical
Services for Church of God Hospital, Kogi State.
·
Design of Mechanical and Electrical
Services for Petrol Station for Alpha Bykeez Ltd, Asaba and other
Locations.
·
Design of Mechanical services for
Scarborough Estate, Asaba.
·
Design of Mechanical Services for New
Osubi 4m Runway and Support Facilities (Cargo Terminal, Parking Lots, Fire
Station, Control Tower, Hanger and Storm Water System)
·
Mechanical and Electrical designs for
Multi-purpose Youth Resource Centre, Sapele.
|
Methodology & Software Toolbox
|
· PM:
Project Management Institute Methodology/PMBOK
· AutoCAD,
AutoCAD MEP, Revit MEP, MS Office Suite, EPANET 2.0, EPA SWMM 5.0, Photoshop
and CorelDraw.
· OS:
MS Windows
|
Interests
|
Project Management, Engineering Design and Consultancy,
Construction Services
|
Reference
|
Can be supplied on Request.
|
No comments:
Post a Comment